Year:2015-2017
Client:M/S. WOW Investment
Contract Value:-
Consultant & Contractor:M/S. Next Engineering
Shoring & Excavation:
  • Secant Pile Shoring (1000mm dia piles)
    • 315 lin-m with 27mtr depth
    • Guide Wall and Capping beam construction
    • Strut and Waler Beam Construction
  • Foundation Pile Construction
    • 1500 & 1000 mm dia 253nos piles
  • Dewatering Works
  • Excavation Works (120,000.00m3)