• R1020/1B Upgrade of Dubai – Al Ain Road Contract 1B

Down
R1020/1B Upgrade of Dubai – Al Ain Road Contract 1B Haritada Gör
Year:November 2019
Client:M/S Road and Transport Authority
Contract Value:
Consultant & Contractor:M/S CDM Smith Inc. & MNG Zemtas Soil & Foundation ENG. CONS.CO
Shoring & Excavation: FOUNDATION PILING WORKS
Construction of 294 nos foundation piles with 1000mm and 1200mm dia with maximum Pre-Qualification Information boring depth 14.0m.

PILE TESTS
Static Load Test for Working & Non-Working Piles, Cross Hole Sonic Logging Test, Integrity Test, Caliper Logging Test

SHEET PILING WORKS
Approximately total 100lin-m sheet pile installation different project areas like around pile caps and extension of bridge wingwalls.