• Arafat Taif Water Transmission System Project (Project No: 20214)

Down
Arafat Taif Water Transmission System Project (Project No: 20214) Haritada Gör
Year:2019-2020
Client:M/S. Swcc
Contract Value:
Consultant & Contractor:M/s. Khatip Alami & M/S. Mapa
Shoring & Excavation:
  • Thrust Boring (717mtr, 1500mm dia)
  • Pipe Insertion
  • Grouting
  • Shoring
  • Piling