• R881/3A COMPREHENSIVE IMPROVEMENT OF THE PARALLEL ROAD EXTRACTION OF SHEET PILES AT UNITS 12&13 UNDERPASS WPD592 DUBAI, UAE

Down
R881/3A COMPREHENSIVE IMPROVEMENT OF THE PARALLEL ROAD EXTRACTION OF SHEET PILES AT UNITS 12&13 UNDERPASS WP-D592 DUBAI, UAE Haritada Gör
Year:2012-2013
Client:Todini
Contract Value:-
Consultant & Contractor:Parsons
Shoring & Excavation:
  • To shored the 14.0m deep excavation sides with double layers of sheet piling in order to support the adjacent piers of bridge and existing services during the execution of NDRC pass (Deep Shaft Construction).
  • First layer of braced sheet pile shoring wall is 42 lin-m
  • Second layer of braced sheet pile shoring wall is 80 lin-m