• R1045 IMPROVEMENT OF INTERCHANGE NO.7

Down
R1045 IMPROVEMENT OF INTERCHANGE NO.7 Haritada Gör
Year:2017
Client:RTA
Contract Value:-
Consultant & Contractor:Aurecom, Mng Zemtas Soil & Foundation Eng. Cons. Co.
Shoring & Excavation: -   Construction of 700 nos foundation piles with 1000 mm dia with maximum boring depth 30m.
-   Static Load Test for Working & Non-Working Piles (1000mm dia piles), Cross Hole Sonic Logging Test, Integrity Test, Caliper Logging Test